DT and Optimization Engineer
Gender: Male
Nationality: Cambodian
Work Experience
DT and Optimization Engineer
- February 2016
to Present
CCPL (Cambodia) Co., LTD - phnom penh
- Investigates Call Drop and network failure
- Consolidates and solves all issue and complaint of network performance
- Monitors and maintains all testing equipments
- Perform other duties as assigned by management
Site Engineer
- August 2014
to February 2016
ZTE HK (Cambodia) Co., LTD - phnom penh
- Site acquisition and TSSR survey report
- Site engineering installation procedure and Site Audit (BTS, MW, DWDM, Power) & Site Documentations
- Supervisor subcontractor to new TI installation Support and Maintenance subcontractor to fix troubleshooting issue
- Project coordinator for DWDM/FDD-LTE Core Network installation and integration
- Subcontractor control, manager and control 4 subcontractors to install new BTS, MW, DWDM and PTN6110
- Create/ Manage Hardware installation Guide and Commissioning Guide
- Onsite SDR B8700 commissioning and fix troubleshooting PTN6120
- Data/Re- Configuration and Software activated element as PLAT, UMTS, LTE and GSM file
- Configuration Fiber Optical and Commissioning
- Pre-PAT testing and Site Auditor with Quality Control standard
- Pre-installation and Installation SDR B8700, PTN 6110 and DWDM
- Supervisor Subcontractor to Swap & Dismantle Existing Materials Support and Maintenance subcontractor to fix troubleshooting issue
- BTS and PTN commissioning, PAC and apply FAC
- BTS integration (GSM & UMTS & LTE)
- DWDM Testing Fiber cable, Splicing test, Power budgeting and Commissioning
- Onsite Inspection and Site Audit, Resolve and fix troubleshooting complain from customer and kept off meeting with customer owner
- Check and verify implementation activated and On air
- Telnet and loop test NE-IP is normal and status
- Check and Modify NE data Configuration status and alarm on site
- Provide training new technical to subcontractor
- GSM/UMTS/LTE Project rollout - 2G Swap, 3G/4G new network integration
Assistant Project Manager
- May 2012
to July 2014
Chum Corporation & Engineering Service Co., LTD - phnom penh
- Pre-sale: support information of equipment manufacturing to meet customer’s requirements based on contract and prepare the contract with customer and prepare Responsibility matrix and confirm with customer
- Implementation: scheduling project roll-out plan, review cutover plan, subcontractor management, quality control, budget planning, resource planning
- Project Kick-off Meeting: subcontractor scope of work (SOW) Preparation subcontractor resource analysis base on implementation period and internal training course.
- Interface with Customer: support and solve all the problem with customer complain and support for technical problem with customer
- Survey: Manage and Review template the TSSR for subcontractor during site survey and SSV report
- Documentation control: TSSR report(Survey template , PAT Document , QC report , packing list , return note , delivery note, Transfer Note, site survey report, PAC and FAC
- Internal management: control manpower warehouse, Material team, safety and delivery team, setup planning to all of them according to implementation plan
- Subcontractor control: manage and control subcontractors to delivery and safety installation with implementation plan on time
- Customer suppliers follow up: Gen-Set ,BTS,BSC,MW,SDH and network power system.
Assistant Project Manager
- December 2010
to May 2012
Power-Telco (Cambodia) Co., LTD - phnom penh
- Manage and submitted PAC, FAC
- Coordinator all subcontractor to solved troubleshoot issues
- Manage and Created QC (Quality Checklist)
- Project coordinator for GSM/UMTS/LTE Core Network installation and integration
- Created TSSR template for subcontractor to do Pre-install and install
- Check and verify MR(Material request ),DN(Delivery Note),RN(Return Note)
- Created Plan, Schedule and Pre-PAT template for subcontractor to do PAT and testing Issue requiring.
- Do /follow up subcontractor daily report, weekly report, and monthly report for directly to project Manager required.
- Directly on site support and fix troubleshooting
- Assisted PM to train subcontractor for Project Procedure , guideline and Planning
- Assisted PM to progress report to customer required by management
- Do summary progress report and troubleshooting
- Do technical site survey report and Do report TSSR, SSV
- Supervisor team installation to swap and dismantle existing materials
- Pre-PAT and Pre-Commissioning BTS3900,APM30H, DBS3900
- MW Alignment (Optix RTN910, RTN950)
Education
BA in Computer Science and Engineering
- 2005
to 2009
Royal University of Phnom Penh - Cambodia
Skill
COMPUTER SKILLS: Microsoft Office, Internet, E-mail, AutoCAD 2D, coral draw, MS Visio, MS Project, Minind management
Language
English (Fluent)
,
Chinese (Mandarin) (Basic)
,
Khmer (Native)